Columbia City |
Code of Ordinances |
Title IX. GENERAL REGULATIONS |
Chapter 97. STREETS AND SIDEWALKS |
CONSTRUCTION OF SIDEWALKS |
§ 97.17. CONCRETE CONSISTENCY.
Latest version.
- The consistency of the concrete shall be measured as described in “Tentative Method of Test for Consistency of Portland Cement, ASTM Serial Designation D 138-32T.” The slump shall not be less than one inch nor more than three inches.(1980 Code, § 97.17) (Ord. 683, passed 4-12-1977) Penalty, see § 97.99